Repairing design of harbour works at Messinia
Country / Area : |
Greece / Messinia - Peloponnese |
|
Institution : |
Perfecture of Messinia |
|
Duration of Service : |
2009 |
|
|
|
More Information
|
|
Project description: |
The study involved a detailed investigation and analysis of a range of information and data in order to propose appropriate works for the repair of damages caused by extreme weather conditions on harbours and beaches of Messinia. |
|
|
Completed works: |
- Final study for six small harbours at Prefecture of Messinia
|
|
|
Works description: |
- Repair damages of Windward quay wall at harbour of Koroni, with composite cross section (seawall with mass concrete units and rubble mound with rock armour units).
- 150.0m reconstruction of quay wall with wave absorption concrete units (“IGLOO” type), that collapsed under wave attach at the beach and dredging of fishing shelter at Petalidi
- restoration of damages at harbours and shoreline from Agios Andreas until Kalo Nero. Specifically, the regions that were studied, were the Fishing shelter at Agios Andreas, Kitries, Marathoupoli and Foinikounta
|
|
|
Construction Cost: |
- Harbour at Koroni 2,300,000.00€
- Harbour at Agios Andreas 450,000.00€
- Fishing shelter at Kitries 135,000.00€
- Fishing shelter at Marathoupoli 50,000.00€
- Beach and Fishing shelter at Petalidi 810,000.00€
- Fishing shelter at Foinikounta 280,000.00€
|
|