Improvement and Extension Fishing Shelter at Tyros


Country / Area : Greece / Tyros – Arcadia, Peloponnise

Institution : Municipality of Apollonas

Duration of Service : 2002 - 2003

More Information



Project description: Project for improving port infrastructure of fishing shelter at Tyros. The fishing shelter at Tyros, after the construction works as a functional and fully equipped fishing shelter to serve 110 fishing vessels not exceeding 18m and a small passenger ship in order to service the maritime transport in the region.


Completed works:
  • Preliminary study of harbour works
  • Environmental impact assessment
  • Coastal study according to waves, currents and their interaction
  • Final study
  • Study for safety and health during construction according to Hellenic legislation
  • Tender documents


Works description:
  • 88.50m windward quay wall with cell concrete sea wall
  • 204.65m berths with cell concrete sea wall
  • Slipway construction with mass concrete armour units of 9m width
  • 68.50m leeward quay wall
  • Dredging at 3.50m depth
  • 14.000 m2 basin
  • land area with deck with physical stones
  • sewerage and storm water drainage (surface collection channels rainwater and storm water drainage pipes, drainage ditches)
  • Land facilities (waste water collection tanks and oil residues) and electrical facilities platforms (electricity supply, water supply, fire fighting, etc.)


Construction Cost: 4,300,000.00€