Windward breakwater extension at Evdilos’ Port


Country / Area : Greece / Evdilos – Ikaria Island

Institution : Perfecture of Samos

Duration of Service : 2010 - 2011

More Information

Project description:

Study of updating / modificating the definite project plan of port at Evdilos, in order to expand the windward breakwater at Evdilos’ Port

Completed works:
  • Detailed alignment design (Final study) for the expansion of the quay wall
  • Study for safety and health during construction according to Hellenic legislation
  • Tender documents

Works description:

201.3m new breakwater extension.  The concrete sea wall is founded at 11m depth internally.  On the external side has a rubble mound with Accropode armour units.

Construction Cost:

11,580,000.00€