Improvement study of highway 77 Chalkida - Psachna - Istiea - Edipsos, section by K.P. 8+000 TO K.P. 20+000


Country / Area : Greece / Municipality of Evia

Institution : Ministry of Infrastructure, Transport and Networks

Duration of Service : 2010 -

More Information

Project description: Our Office was responsible for developing the hydraulic studies, which involved:
  • Drainage – draining the main artery
  • Hydraulic works along the main artery and drainage-drainage works on the internal of the tunnel
Completed works:
  • Preliminary study of hydraulic works


Works description:
  • 6.67km drainage – draining of the main artery (on the open sections)
  • Culverts along the main artery
  • 2.9Km sewerage and draining works on the Interior of the tunnel
Construction Cost: 3.100.000,00€