Replacement of the internal water supply network of Krioneri
Country / Area : |
Greece / Department of Korinthia |
|
Institution : |
past Municipality of Sikionies |
|
Duration of Service : |
06-2000 to 09-2000 |
|
|
|
More Information
|
|
Project description: |
The objective of the study was the replacement of existing internal network of water supply of the settlement of Kryoneri, with a new one that will be able to serve on a 40-year horizon. The function of the water supply network was simulated with WaterCad software package and various alternative operating scenarios where resolved. |
|
|
Completed works: |
- Final study of hydraulic works
- Drafting of tender documents
|
|
|
Works description: |
- Replacement of 9 km total length of existing water supply network
|
|
|
Construction Cost: |
1.620.000,00€ |
|