Small harbour works at Mesohoria
| Country / Area : |
Greece / Mesohoria – Evia island |
|
| Institution : |
Perfecture of Evia |
|
| Duration of Service : |
2000 – 2006 |
|
|
|
More Information
|
|
| Project description: |
In this study we investigated the possibility of construction a small harbor that service 66 vessels and small crafts in the sea area of Mesohoria in Evia. |
|
|
| Completed works: |
- Preliminary study of harbour works
- Environmental impact assessment
- Coastal study with mathematical modelling
- Final study of harbour works
- Study for safety and health during construction according to Hellenic legislation
|
|
|
| Works description: |
- 98.20m, Windward quay wall with composite cross section. Berth with wave absorption concrete seawall (IGLOO type) and rubble mound with concrete armour units (Accropode)
- 66.30m pier with wave absorption concrete seawall (IGLOO type)
- 103.0m, Berth with wave absorption concrete seawall (IGLOO type)
- Slipway with concrete units
- 14.40m leeward mole with rubble mound rock armours
- 5000 m2 basin from 3.50m until 5.0m depth
- Land facilities (waste water collection tanks and oil residues) and electrical facilities platforms (electricity supply, water supply, fire fighting, etc.)
|
|
|
| Construction Cost: |
5,895,000.00€ |
|