Tourist craft shelter of “ALMAR S.A.”, ALMAR S.A.
Country / Area : |
Greece / Agios Nikolaos – Agios Nikolaos, Crete island |
|
Institution : |
ALMAR S.A. |
|
Duration of Service : |
2005 – 2008 |
|
|
|
More Information
|
|
Project description: |
The study involved the design of harbor works for 15 sailing boats and yachts up to 9.50m length in front of a hotel owned in “ALMAR S.A.” at Agios Nikolaos (east Crete), also the coastal management planning. |
|
|
Completed works: |
- Environmental impact assessment
- Engineering consultancy services and construction supervision
|
|
|
Works description: |
- 132.0m windward quay wall with composite cross section, seawall with mass concrete units and rubble mound with rocks.
- Widening of opening the quay wall to assist seawater renewal
- 88.0m concrete retaining wall, covered with stones, at the back of the beach area
- Land facilities (electricity supply, water supply, fire fighting, etc.)
|
|
|
Construction Cost: |
2,230,000.00€ |
|