Hotel port of “MIRAMPELLO S.A.”


Country / Area : Greece / Agios Nikolaos – Agios Nikolaos, Crete island

Institution : MIRABELLO S.A.

Duration of Service : 2005 – 2008

More Information

Project description: The study involved the design of harbor works for 30 sailing boats and yachts up to 15.0m length in front of a five star hotel owned in “MIRABELLO S.A.” at Agios Nikolaos (east Crete), as well as the coastal management planning.


Completed works:
  • Preliminary study
  • Environmental impact assessment
  • Coastal study
  • Final study
  • Engineering consultancy services and construction supervision


Works description:
  • 100.70m windward quay wall with composite cross section, seawall with mass concrete units and rubble mound with rocks.
  • Basin from 3.50m until to 5.0m depth
  • 74.70m berth with mass concrete units at 3.50m depth
  • 10.55m pier with trapezoide shape
  • 215.0m sandy beach
  • 56.80m rock armour revetment in order to protect the beach fill and to extend the land area
  • 47.60m detached breakwater with composite cross section for sailing crafts
  • 48.0m floating pontoon in order to connect the breakwater with the land area
  • Land area with road access, plants and pedestrians
  • Land facilities (waste water collection tanks and oil residues) and electrical facilities platforms (electricity supply, water supply, fire fighting, etc.)
  • Equipment for safe berthing at all berths


Construction Cost: 3,500,000.00€