Reconstruction of Fishing shelter at Fanes
Country / Area : |
Greece / Fanes – Rhodes Island |
|
Institution : |
Municipal Harbor fund of Southern Dodecanese |
|
Duration of Service : |
2013 |
|
|
|
More Information
|
|
Project description: |
Study of works to improve the existing port infrastructure in order to address the constant silting of sand and seaweed of the basin, and to reverse the corrosive mechanism on the northeast coast. |
|
|
Completed works: |
- Preliminary study of harbor works
- Coastal engineering study
|
|
|
Works description: |
- 65,0m west breakwater
- 427,50m central curved shaped breakwater
- 100,0m east breakwater
- 7,0m wide slipway
- 100,0m long and 10,0m wide access corridor
- Polygonal shape platform with 20,0m long sides and 118,30m perimeter
- Five floating pontoons with a length of 51,0m to 62,50m each
- Repair of harbor infrastructure and land facilities completion
- Basin dredging until 3,0m depth, in the access corridor area
- Repair of existing infrastructure
- Land facilities (waste water collection tanks and oil residues) and electrical facilities platforms (electricity supply, water supply, wi-fi, etc.)
|
|
|
Construction Cost: |
9.294.432,90 € |
|