Environmental impact assessment for Sailing center at Marathoupoli


Country / Area : Greece / Marathoupoli - Peloponnese

Institution : Municipality of Gargalianoi

Duration of Service : 2004

More Information

Project description: The environmental study explored the impact on the marine and terrestrial environment before and after the construction of harbour works serving 15 sailing crafts. The studies carried out have ascertained whether the proposed works are consistent with the local and social requirements of the region of the project, the safety and the protection of public health and the environment.


Completed works:
  • Environmental impact assessment (Preliminary study, submitted)


Works description:
  • 90.0m, windward quay wall with rubble mound of rock armour units
  • 60.0m berths
  • Slipway with concrete units
  • 3000m2 land area
  • 12500m2 basin at 2.50m depth
  • Construction of necessary equipment for safety berthing at berths
  • Water and electricity supply networks
Construction Cost: 590.00,00€