Environmental impact assessment for Small harbour works at Agia Anna


Country / Area : Greece / Paralia of Agia Anna – Evia island

Institution : Perfecture of Evia

Duration of Service : 2007

More Information

Project description: With the process of carrying out environmental studies, we explored the impact on the marine and terrestrial environment before and after the construction of harbour works serving 50 small crafts. In the studies carried out it was ascertained whether the proposed works is consistent with the local and social requirements of the region of the project, the safety and the protection of public health and the environment.


Completed works:
  • Environmental impact assessment (approved by Α.Π. 16068/1907/17-04-2008)


Works description:
  • 135.0m, Windward quay wall with composite cross section. Berth with mass concrete seawall and rouble mound with concrete armour units (Accropode)
  • 100.0m, Berth with mass concrete seawall
  • Slipway with concrete units
  • 112.0m pier with mass concrete seawall
  • 5500 m2 basin at 7.0m depth
  • 118.0m new road access
  • Land facilities (waste water collection tanks and oil residues) and electrical facilities platforms (electricity supply, water supply, fire fighting, etc.)
Construction Cost: 7.950.000,00€