Preliminary study of hydraulic works in the area of Melissi (K.P. 22+500 TO K.P. 26+500)
| Country / Area : |
Greece / County of Korinthos |
|
| Institution : |
ERGA OSE S.A. |
|
| Duration of Service : |
10-2003 to 04-2004 |
|
|
|
More Information
|
|
| Project description: |
Our office was responsible for developing the hydraulic studies, which included:
- Flooding protection of a new railway line (NRL) in the area of Melissi, County of Korinthos
- Draining of the above new railway line
- Arrangement of cross streams and check their adequacy profiled
|
|
|
| Completed works: |
- Preliminary study of hydraulic works
|
|
|
| Works description: |
- Flood protection (NRL) (K.P. 22+500 TO K.P. 26+500)
- Drainage (NRL) (K.P. 22+500 TO K.P. 26+500)
- Arrangement of cross streams and check their adequacy profiled with uneven flow calculation
|
|
|
| Construction Cost: |
4.600.600,00€ |
|