Study of Trans European road axis Stavrou-Lavriou, Section: Bypass Markopoulo


Country / Area : Greece / County of East Attikis

Institution : Ministry of Infrastructure, Transport and Networks

Duration of Service : 09-2009 to 11-2011

More Information

Project description:

Our office was responsible for developing the hydraulic studies, which included:

  • Rainwater drainage - road drainage of bypass Markopoulo
  • Designing culverts of transportation projects, for the two lateral in road project basic streams of the region, the stream of St. Konstantinos and the stream of Strongyli
  • Arrangement and delimitation of these two streams


Completed works:
  • Preliminary hydraulic study for the arrangement of the streams of St. Constantine and Strongyli


Works description:
  • Rainwater drainage - road drainage of bypass Markopoulo (artery, adjacent roads and three new interchange nodes)
  • Design culverts of transportation projects, for the streams of St. Konstantinos and Strongyli
  • 500m of Agios Konstantinos' stream arrangement with open concrete-covered cross-section
  • 730m of Strongyli stream arrangement with open concrete-covered cross-section
  • Delineation of the two streams, downstream of the road project and until the head of the hydraulic project of Attiki Odos