Replacement of the internal water supply network of the city of Kiato


Country / Area : Greece / Department of Korinthia

Institution : past Municipality of Sikionies

Duration of Service : 06-2000 to 09-2000

More Information

Project description: The objective of study was the construction of a new water supply network of the town of Kiato. The network was studied and designed to meet the needs of the town of Kiato on a 40-year horizon. In resolving the problem of the water supply network we examined two sets of different scenarios to deal. Initially we checked the operation of the network with the assumption that all of the required supply enters from an existing tank. In addition studied the operation of the network with the assumption that the new network could be the future water supply of the settlements of "Pasio" and "kato Diminio". The function of the water supply network was simulated with WaterCad software package and 13 different operating scenarios where totally resolved. This way, the final diameters of the pipelines of the proposed network where determined.


Completed works:
  • Final study of hydraulic works
  • Drafting of tender documents


Works description:
  • 41000m of new water supply network


Construction Cost: 7,925,000.00€